Check category

The first unit of Huadian Jinshangbatang Hydropower Station was officially connected to the grid for power generation

  • Categories:News
  • Author:Mr.Market
  • Origin:CCTV
  • Time of issue:2025-05-16 11:31
  • Views:

(Summary description)The first unit of Huadian Jinshangbatang Hydropower Station was officially connected to the grid for power generation

The first unit of Huadian Jinshangbatang Hydropower Station was officially connected to the grid for power generation

(Summary description)The first unit of Huadian Jinshangbatang Hydropower Station was officially connected to the grid for power generation

  • Categories:News
  • Author:Mr.Market
  • Origin:CCTV
  • Time of issue:2025-05-16 11:31
  • Views:
Information

According to CCTV, on May 15, 2025, the first unit of Huadian Jinshangbatang Hydropower Station, a major project of the national "14th Five Year Plan" located in the upper reaches of the Jinsha River, was officially connected to the grid for power generation after 72 hours of trial operation.

 

Batang Hydropower Station is located on the main stream of Jinsha River at the junction of Batang County, Sichuan Province and Mangkang County, Xizang. It is an important supporting power source for the clean energy base in the upstream of Jinsha River. The power station is equipped with three 250000 kW mixed flow water turbine generators, with a total installed capacity of 750000 kW and an average annual power generation of 3.375 billion kWh, which can supply electricity for 1.75 million households for one year.

 

All of its control system cabinets, totaling over 200 units, are provided by our company.

 

As an important peak shaving power source for the world's highest altitude DC transmission channel - the Jinshang to Hubei ultra-high voltage transmission channel, the Batang hydropower station is expected to be fully operational in September this year. This will provide strong support for accelerating the large-scale development and application of clean energy in the upper reaches of the Jinsha River

Keyword:

Scan the QR code to read on your phone

Link to AUSTRIA MEHLER COMPANY

Wuhan ME Electric Co.,Ltd will always implement the quality policy of "Perfect product-Timely delivery-Better service"
wholeheartedly provide satisfactory services for users in various fields

Address

18 Gexin Avenue, Zoumaling, Dongxihu District, Wuhan, China

◎2021 All rights reserved  Wuhan ME Electric Co.,Ltd.    鄂ICP备19006047号-3  BY:xinnet