Check category

On November 7, 2023, the on-site control system renovation equipment for the north line of the fifth level ship lock of the Three Gorges Dam on the Yangtze River passed the acceptance inspection by our company

  • Categories:News
  • Author:Mr.Market
  • Origin:Marketing Dept.
  • Time of issue:2023-11-30 16:34
  • Views:

(Summary description)On November 7, 2023, the on-site control system renovation equipment for the north line of the fifth level ship lock of the Three Gorges Dam on the Yangtze River passed the acceptance inspection by our company

On November 7, 2023, the on-site control system renovation equipment for the north line of the fifth level ship lock of the Three Gorges Dam on the Yangtze River passed the acceptance inspection by our company

(Summary description)On November 7, 2023, the on-site control system renovation equipment for the north line of the fifth level ship lock of the Three Gorges Dam on the Yangtze River passed the acceptance inspection by our company

  • Categories:News
  • Author:Mr.Market
  • Origin:Marketing Dept.
  • Time of issue:2023-11-30 16:34
  • Views:
Information

On November 7, 2023, the on-site control system renovation equipment for the north line of the fifth level ship lock of the Three Gorges Dam on the Yangtze River passed the acceptance inspection by our company.

This system is independently developed by Three Gorges Group and integrated by our company, and its product process requirements are very strict. The one-time acceptance of 60 integrated cabinets is a full affirmation of the quality of our products.

Keyword:

Scan the QR code to read on your phone

Link to AUSTRIA MEHLER COMPANY

Wuhan ME Electric Co.,Ltd will always implement the quality policy of "Perfect product-Timely delivery-Better service"
wholeheartedly provide satisfactory services for users in various fields

Address

18 Gexin Avenue, Zoumaling, Dongxihu District, Wuhan, China

◎2021 All rights reserved  Wuhan ME Electric Co.,Ltd.    鄂ICP备19006047号-3  BY:xinnet